200 kWp

A solar power plant with 200 kWp output is an ideal choice for smaller and middle-sized companies. We will design everything with a view to your company’s needs and your operation’s maximum level of use. This type of solar power system can be placed on any type of roof.

  • create project documentation
  • obtaining output reservation
  • obtaining license from the Energy Regulatory Office
  • statics assessment
  • arranging construction permit
  • arranging fire safety solution
  • fire department statement

Roof installation

500 kWp

A solar power plant with 500 kWp output is an ideal choice for middle-sized and biger companies. We will design everything with a view to your company’s needs and your operation’s maximum level of use. This type of solar power system can be placed on any type of roof.

  • create project documentation
  • obtaining output reservation
  • obtaining license from the Energy Regulatory Office
  • statics assessment
  • arranging construction permit
  • arranging fire safety solution
  • fire department statement

Roof installation

1 MWp

A solar power plant with 1 MWp output is an ideal choice for big companies. We will design everything with a view to your company’s needs and your operation’s maximum level of use. This type of solar power system can be placed on any type of roof.

  • create project documentation
  • obtaining output reservation
  • obtaining license from the Energy Regulatory Office
  • statics assessment
  • arranging construction permit
  • arranging fire safety solution
  • fire department statement

technical specification

Ušetření CO2 During the power plant’s period of use, you will reduce CO2 emissions equivalent to about 52 tonnes of brown coal.

Installed output 200 kWp Warranty 2—4 years
Output voltage 400 V / 50 Hz / 3fáze Manufacturer’s warranty on inverter 10 years
Solar panels 444 x 450 Wp Warranty on solar panel 12—15 years
Inverter 2x 3f inverter 100 kW Warranty of solar panel performance up to 30 years
Anchoring the modules all types of roofs Price per installed kWp from 688 €
System life up to 30 years CO savings 93,7 t/year
System return 7,2 years
Installed output 500 kWp Warranty 2—4 years
Output voltage 400 V / 50 Hz / 3fáze Manufacturer’s warranty on inverter 10 years
Solar panels 1111 x 450 Wp Warranty on solar panel 12—15 years
Inverter 4x 3f inverter 120 kW Warranty of solar panel performance up to 30 years
Anchoring the modules all types of roofs Price per installed kWp from 676 €
System life up to 30 years CO savings 234,6 t/year
System return 7,1 years
Installed output 1 MWp Warranty 2—4 years
Output voltage 400 V / 50 Hz / 3fáze Manufacturer’s warranty on inverter 10 years
Solar panels 2222 x 450 Wp Warranty on solar panel 12—15 years
Inverter 4x 3f inverter 250 kW Warranty of solar panel performance up to 30 years
Anchoring the modules all types of roofs Price per installed kWp from 649 €
System life up to 30 years CO savings 469,1 t/year
System return 6,8 years
Pricewithout VAT72 137 € I’m interested

Implementation
process

+420 730 701 681

I’m interested
  • 1

    Pre-implementation meeting

    At a free consultation, we’ll field all your questions and requirements. We will use the collected information to create the most effective solution and custom design a solar power system for your company. We’ll discuss the offer together and, after approval, sign a work contract.

  • 2

    Arranging permits

    After the contract is signed and the deposit paid, the next step is reserving power output for your solar electric plant with the power company. Once we receive the power plant connection contract, the implementation process will start.

  • 3

    Drawing up project documents

    We'll draw up the project completion documentation and arrange the building permit, static assessment, and statement from the fire department. All in the form of a turnkey project.

  • 4

    Solar power installation

    In keeping with the contract and the approved construction schedule, we'll start construction of your solar power plant. An experienced project manager is at your service for the entire construction period. (10 to 30 days)

  • 5

    Starting the power plant

    We test to verify operation of the power plant. Once you’ve been trained, we’ll put your power plant into operation, and you’ll be producing clean energy for your company.

CONTACT FORM

Write to us, and we’ll contact you
as soon as possible

email address:
Homepage:
URL:
Comment:

By sending the form, you consent to processing of personal data