Installed output
138,24 kWp
Realization date
2021
About instalation
Complete installation of a photovoltaic power plant on the roof of the sports center Bospor. We set up the power plant from design, implementation and commissioning. The installation took place in 2021.
Technical specification
Installed output | 138,24 kWp |
Photovoltaic panels | 432 x Amerisolar_AS-6M30 Silver_320 Wp |
Inverter | Solar Edge 82.8k + 55k |
Warranty | 5 years |
Manufacturer’s warranty on inverters | 20 years |
Warranty on panel performance | 30 years for 85 % solar panel degradatio |